Description
Supply of all labour, plant, equipment and supervision to complete the install of 7km of DN355 PN12.5 Pipeline at MT Whaleback for UON / BHP. The works also included survey works, the installation of 340m of DN560 black polyethylene pipe for trenched road crossing sleeves, installation of fittings and valves, trenchless horizontal directional drilling beneath a roadway, railway and gas main with all associated civil works. The works were carried out over a 6 week period where both safety and quality exceeded the Client's expectations.